top of page
Surly Destination Brewery
Minneapolis, MN
Connor Smith | Mechanical
Advisor : Dr. Gregory Pavlak
HOME | ABOUT ME | STATISTICS | ABSTRACT | COMMUNICATION LOG | TECH REPORTS | PROPOSAL
PRESENTATION | FINAL REPORT | REFLECTION
Tech Reports
Tech Report 1 is an overview of the primary mechanical systems in the project. This includes information and example schematics for the RTUs, mini-split systems, unit heaters, and the brewing process.
Tech Report 2 looks into the compliance of the current design of the project with ASHRAE Standard 62.1 - Ventilation for Acceptable Indoor Air Quality - Sections 5 & 6 and ASHRAE Standard 55 - Thermal Environmental Conditions for Human Occupancy.
Tech Report 3 evaluates the estimated loads on the building and energy consumption. As part of the evaluation, actual energy usages and the energy model results were used to estimate the energy consumption of the brewing process.
News Feed
CPEP Ready for Final Review
Presentation
Final Report
Updated Proposal Posted on CPEP
Final CPEP Review
Proposal Posted on CPEP
Tech Report 3
CPEP Abstract Page
Building Statistics Part 2
Building Statistics Part 1
Tech Report 2
Bio Sketch Peer Review & Corrections
Bio Sketch
CPEP Full Functionality
Master List Check
Tech Report 1
Mailed AE Letter
Personal Letters Sent
Project Initiation Checklist 2
CPEP Website Home Page
CPEP Seminar
Project Initiation Checklist 1
Obtained Project Drawings
Owner Permission Received
4/29/19
4/29/19
4/1/19
1/14/19
12/7/18
12/7/18
10/29/18
10/26/18
10/17/18
10/1/18
9/28/18
9/14/18
9/14/18
9/10/18
9/10/18
9/07/18
9/06/18
9/06/18
9/05/18
9/04/18
8/29/18
8/20/18
7/25/18
7/24/18
bottom of page